The following list of requirements are for Fire Protection System Permits and are in addition to all other requirements for Commercial Permits.
Fire Alarm System
- 2 sets of Design Plans, signed/sealed if over $5,000.00 valuation
- 2 sets of Specifications / Technical Documents
Fire Sprinkler System
- 2 sets of Design Plans, signed/sealed for over 50 heads
- 2 sets of Hydraulic Calculations
- No Permit required for relocating up to 3 heads
Fire Suppression System
- 2 sets of Design Plans, signed/sealed for over $5,000.00 valuation
- 2 sets of Specifications / Technical Documents
Exhaust Hoods
- 2 sets of Design Plans, (pre-engineered) not signed & sealed
- 2 sets of Specifications / Technical Documents (pre-engineered)
- 2 sets of Construction Plans (Site Built) signed & sealed
Standpipe System
- 2 sets of Design Plans, signed/sealed for over $5,000.00 valuation
- 2 sets of Hydraulic Calculations
Fire Pump
- 2 sets of Design Plans, signed/sealed for over $5,000.00 valuation
- 2 sets of Hydraulic Calculations
Fire Protection System Demolition
- 2 Letters of Intent (all removals / disconnects)
- Scope of Work Statement
Paint Spray Booth
- 2 sets of Design Plans, (pre-engineered) not signed & sealed
- 2 sets of Specifications / Technical Documents (pre-engineered)
- 2 sets of Construction Plans (Site Built) signed/sealed
Tank Installations - Any Type
- 2 sets of Design Plans, (pre-engineered) not signed & sealed
- 2 sets of Specifications / Technical Documents (pre-engineered)
-
2 sets of Construction Plans (Site Built) signed/sealed
2 Letters of Intent
Tank Removal - Any Type